GOMEZ

The Lonestar Team managed to conversion of a drilling semisubmersible unit to a moored floating production unit.  Lonestar managed the engineering, construction, installation and operation of the unit in the Gulf of Mexico.

MC 711 Gomez  – 3000 ft. Water Depth

  • Retrofit Rowan “Midland” MODU to FPU, 20,000 BOPD & 65MMSCFD gas process facilities.

  • Install 28 mile 8” & 10” export pipelines

  • Tie back two local subsea wells.

  • Install 6-slot subsea manifold.

  • Tie back three additional subsea wells.

  • Debottleneck to a gas production capacity of 100MMSCFD and oil production capacity of 25,000 BOPD.

MC 711 Gomez Field Expansion – 3000 FSW

  • Tie back five additional subsea wells from MC 754, MC 711 & MC 710.